|
|
|
|
|
152 |
Taipei Medical University attached to the hospital third medical building new constructio |
Taipei Medical College |
Ta Chen Constrution &Engineering Corp. |
2006.01 |
151 |
Linkou Future City TopDown engineering studies secondary joints Method Non-shrink grout |
|
Farglory Group. |
2005.12 |
150 |
National Freeway Tian-Liao NO.1 broaden 531,521 mark pier reinforcement grouting |
Area National Freeway Bureau. MOTC R.O.C. |
Double Construction Co., LTD., |
2005.11 |
149 |
West Coast Expressway No.61 WH77-3 STA Chiku Creek side lane Landscape Bridge new construction |
Directorale General of Highways,MOTC |
Southeast Asia Engineering Co., Ltd. |
2005.09 |
148 |
JiaShanYue construction Keelung case basement TopDown engineering studies secondary connector Non-shrink grouting |
Cooperative Construction CO.,Ltd. |
XingGe Engineering Enterprises Ltd. |
2005.08 |
147 |
Oman Life new construction -A33 (B4F TopDown engineering studies secondary joints Method Non-shrink grout) |
Metropolis create Corp. |
XingGe Engineering Enterprises Ltd. |
2005.07 |
146 |
GuoMei construction Lutheran Garden Square new construction (B Hall) |
Jinhong Cheng create Corp. |
LianGang Heavy Industries Co., Ltd. XingGe Engineering Enterprises Ltd. |
2005.06 |
145 |
National Taiwan University College of Medicine attached to the hospital Children's Medical Building New construction |
National Taiwan University. Attached to the hospital. |
Kedge Construction Co., LTD., |
2005.05 |
144 |
Nangang station (underground) civil, electrical and mechanical engineering(CL305STA.) |
Railway Reconstruction Bureau Ministry of Transportation and Communica |
/Yi Ta/ Evergreen Construction Co., LTD., |
2005.05 |
143 |
Chunghwa Telecom Daan room cum Daan line new construction |
Chunghwa Telecom Co., Ltd. |
CHUN YAUAN Construction Co., LTD., |
2005.04 |
142 |
Provincial Highway NO.21 95k ~ 100k bridge embankment (ShiBaZhongXi bridges, Chenyou Lan River Bridge and Graptolite bridge) project |
Fourth Maintenance Office Directorale General of Highways,MOTC |
CHUN YAUAN Construction Co., LTD., |
2005.03 |
141 |
National Palace Museum. Seismic reinforcement works |
Executive Yuan |
Ta Chen Constrution &Engineering Corp. |
2005.03 |
140 |
Railway Yilan Line Dongshan Station station marked the second project to improve the reconstruction |
Railway Reconstruction Bureau Ministry of Transportation and Communica |
JieXing Construction Co., LTD. |
2005.03 |
139 |
West Coast Expressway No.62 13 STA.(P14~P16Disc bearing pad Mortar) |
Northt Engineering Office Construction and Planning Agency |
Double Construction Co., LTD., XingGe Engineering Enterprises Ltd. |
2005.02 |
138 |
National Freeway Tian-Liao NO.3 C388STA. |
Taiwan Area National Expressway Engineering Bureau |
State Teng Construction Co., LTD., |
2005.02 |